Before You Sign: Why an Attorney Should Review Your Construction Contract
Whether you are adding a family room in Fairfield, gutting a kitchen in Westport, or building out commercial space in Norwalk, the construction contract you sign decides who pays when something goes wrong. Contractors usually present their own form, written to protect the contractor, and many owners sign it at the kitchen table after a quick read. That is a mistake. An attorney’s review can save you thousands of dollars and months of aggravation.
Connecticut’s Home Improvement Act
Most residential renovation work in Connecticut is governed by the Home Improvement Act, Conn. Gen. Stat. Section 20-418 and following. The Act covers remodeling, additions, roofing, siding, windows, driveways, pools, landscaping and similar work on a home, including residential rental property of up to six units, when the price is more than $200. It does not apply to construction of a new home, which is covered by a separate statute.
Under Section 20-429, a home improvement contract is not valid or enforceable against the homeowner unless it:
- is in writing and signed by both the owner and the contractor;
- contains the entire agreement between them;
- states the date of the transaction;
- states the contractor’s name, address and Department of Consumer Protection registration number;
- includes a notice of the owner’s right to cancel within three business days;
- contains a starting date and a completion date;
- is entered into by a registered contractor or salesperson; and
- discloses the other contracting businesses the contractor’s owners have been involved with during the previous five years.
Every change order must also be in writing and signed by both the owner and the contractor. The contractor must give you a completed copy of the contract when it is signed and must obtain all required building permits before starting work.
Two practical tips. First, look up the contractor’s registration on the Department of Consumer Protection’s online license lookup before you sign. Second, if more than 30 days have passed since the contract’s starting date and no substantial portion of the work has been performed, the Act generally requires the contractor to refund your payment within ten days of your written request.
These requirements protect homeowners, and a contractor who ignores them may find it very difficult to get paid, a subject we cover in our companion article on disputes with your general contractor. But the statute sets only a floor. It says nothing about many of the terms that matter most when a project goes wrong.
Insurance Provisions
Contractor forms are often silent on insurance or require very little. To register in Connecticut, a home improvement contractor must show general liability coverage of only $20,000, a small fraction of the damage a fire, water event or structural failure can cause in a Fairfield County home. A well-drafted contract should require:
- Commercial general liability (CGL) insurance at meaningful limits. We typically recommend at least $1 million per occurrence, covering damage to your property and injuries to others.
- Workers’ compensation coverage for the contractor’s employees. If an uninsured worker is injured on your property, the claim may land on you and your homeowner’s policy.
- Additional insured status for you on the contractor’s CGL policy, so you can make a claim directly against the contractor’s carrier.
- Certificates of insurance delivered before work begins, ideally directly from the contractor’s insurance agent, with notice to you if coverage is cancelled.
- The same requirements for subcontractors, who often perform the riskiest work.
- Coordination with your own coverage. Call your homeowner’s carrier before a major renovation. Some policies restrict coverage during construction or while a home is unoccupied, and a large project may call for a builder’s risk policy. The contract should state who will carry it.
Delay Clauses
Delay is the most common complaint we hear from homeowners, and it is the issue contractor forms are most carefully written to avoid. The Home Improvement Act requires a completion date, but it imposes no penalty when the contractor misses it. Without a delay clause, a homeowner’s only remedy for a late project is to prove actual damages, such as rent for temporary housing, storage fees or extra loan interest, which is expensive and often difficult to do.
We recommend a liquidated damages clause with a two-week grace period. If the work is not substantially complete within two weeks after the completion date, the contractor owes you a fixed amount for each additional day of delay. The grace period is fair to the contractor and absorbs minor scheduling problems. The daily amount should be a reasonable estimate of your actual cost of delay, because a court may refuse to enforce a figure that operates as a penalty. A family renting a house during the renovation, for example, might set the daily amount near the cost of that rental.
The clause should also limit excusable delays to events genuinely beyond the contractor’s control, such as severe weather or changes you request, require any extension of time to be documented in a signed change order, and allow you to deduct accrued delay damages from the payments due.
Payment Schedules, Retainage and Lien Waivers
- Tie payments to milestones, not dates. Pay for completed stages of work, such as foundation, framing, passed rough inspections and drywall, rather than for the passage of time. Avoid a large upfront deposit beyond what is needed to order materials.
- Hold back retainage. Withhold a percentage of each payment, commonly 5 to 10 percent, until the punch list is finished and the final inspection or certificate of occupancy is issued.
- Require lien waivers. Subcontractors and suppliers who are not paid by your contractor may record a mechanic’s lien on your home, and clearing it can be costly even if you have paid the contractor. Require written lien waivers from the contractor, and from major subcontractors and suppliers, with each payment.
- Cover the rest of the basics. Address warranties on workmanship, your right to terminate for cause, cleanup, and whether disputes go to mediation, arbitration or court.
Commercial Projects
The Home Improvement Act does not protect commercial property owners. A business that renovates an office, builds out retail space or expands a warehouse has only the protection the contract itself provides. Commercial contracts are often based on American Institute of Architects (AIA) forms or the contractor’s own paperwork, and they tend to be longer and more negotiable. The same issues apply, with more money at stake: insurance and indemnification, liquidated damages for delay (especially when a lease commencement or business opening depends on completion), retainage, lien waivers and change order procedures. If you are a tenant doing a build-out, your lease may also impose requirements on your contractor that the construction contract must match.
How Russo & Rizio Can Help
We review and negotiate residential and commercial construction contracts for owners throughout Fairfield County, including Fairfield, Westport, Weston, Darien, New Canaan, Greenwich and Bridgeport. We regularly see what happens when a contract is silent on insurance, delay or payment, and we draft to keep those problems from happening to our clients. If a dispute has already arisen, see our companion article on disputes with your general contractor.
Before you sign a construction contract, email Rob Russo at Rob@Russorizio.com. A few hours of review now can prevent a very expensive problem later.
This article is provided for general informational purposes only and is not legal advice. Reading it does not create an attorney-client relationship.